Roadmap to accelerate the commercial acceptance of seabird collision detection systems for offshore use

Delivered by the Prevalence of Seabird Species and Collision Events in Offshore Wind Farms (PrediCtOr) project.

Image
Roadmap to accelerate the commercial acceptance of seabird collision detection systems for offshore use

Overview

Seabird collision assessments in offshore wind rely heavily on modelling approaches that contain substantial uncertainty due to limited empirical validation, while automated collision monitoring technologies face challenges in achieving regulatory and commercial acceptance. The PrediCtOr project Roadmap to accelerate the commercial acceptance of seabird collision detection systems for offshore use sets out a framework to accelerate the commercial acceptance of offshore seabird collision monitoring systems capable of generating reliable empirical data.
 

The Roadmap was developed through a review of existing monitoring technologies, regulatory requirements and industry experience, alongside engagement with monitoring equipment suppliers, regulators, environmental authorities, offshore wind developers and researchers. Lessons from previous offshore deployments and findings from the PrediCtOr best practice guidance documents were used to identify the challenges limiting adoption and to define a framework for technology acceptance. 

The assessment identified two overarching barriers to commercial acceptance: confidence in the quality and interpretability of data collected by monitoring systems, and confidence in the technical feasibility of deploying and operating monitoring systems in offshore environments. To address these challenges, the Roadmap establishes a set of six core performance indicators and three maturity stages for system acceptance:

  1. At the baseline stage, a system has been proven in onshore or nearshore settings and has generated evidence on core functionality, detection capability and operational limitations.
  2. At the pre-commercial stage, the system has been demonstrated in an offshore wind farm environment, allowing its performance boundaries, data limitations and technical feasibility to be assessed under more representative conditions.
  3. At the commercial stage, the system has shown reliable performance across multiple offshore deployments, with well-characterised limitations and sufficient evidence to support routine use in offshore monitoring programmes.

The Roadmap also highlights the potential for misalignment between developers and monitoring suppliers, and practical tools to support this. This includes a technical specification template to consistently communicate system capabilities, and roles and responsibilities for each stage of the development process.

Overall, the Roadmap concludes that accelerated commercial acceptance will require greater transparency, improved offshore validation, shared performance metrics and stronger collaboration across the sector. By providing a common framework for evaluating and communicating monitoring system capability, the Roadmap offers a practical pathway towards routine deployment of offshore collision monitoring technologies and the generation of the empirical evidence needed to improve future seabird collision assessments. 

PrediCtOr project information

PrediCtOr project was initiated and set up within the Offshore Renewables Joint Industry Programme (ORJIP) for Offshore Wind. The project is jointly delivered by the Carbon Trust, British Trust for Ornithology (BTO), and Waardenburg Ecology. The delivery of the data and installation design best practice guidance documents was additionally supported by DMP Statistical Solutions and Ramboll.

PrediCtOr project partners: Equinor, Ørsted, Rijkswaterstaat, RWE, Scottish Government (Offshore Wind Directorate and Marine Directorate), ScottishPower Renewables, Shell, and TotalEnergies.

The project forms part of the Offshore Wind Evidence and Change Programme (OWEC), led by The Crown Estate, in partnership with the Department for Energy Security and Net Zero and the Department for Environment, Food and Rural Affairs.

Offshore Wind Evidence and Change Programme, The Crown Estate

 

Resource Download Form

Download your copy

Complete the form below to access this resource (the download will appear at the bottom of this page).

Country *