Offshore Wind Accelerator: Analysis of flange tolerance relaxation and shimming on large diameter bolted connections

Call for entries from companies and consortia interested to undertake a study that aims to produce design and fabrication guidance for the optimisation of large diameter flange connections.

The main objectives of this work are to:

  • Produce design and fabrication guidance for the optimisation of large diameter flange connections.
  • Determine the impact of more relaxed flange fabrication tolerances on the design of flanges and bolts, with an aim of allowing relaxed fabrication tolerances to reduce costs. 
  • Analyse the effectiveness of shimming for compensation of flange tolerances.

Clarification questions should be received by 17:00 BST 24 May 2021 and the answers to these questions will be posted below on 28 May 2021.

The closing date to receive tender submissions is 14:00 BST 23 June 2021.

All clarification questions and tender submissions should be sent electronically, by their respective deadlines, to Emily Northridge at emily.northridge@carbontrust.com, with Tom Wishart at tom.wishart@carbontrust.com in copy.