Calling for entries from companies and consortia interested in undertaking a study for the OWA Logistics and O&M Technical Working Group (TWG-L) to investigate transition piece (TP) platform design optimisation in context to O&M.
The main objectives of this work are to:
- Understand and assess the current operations and maintenance strategies used across the industry and how these impact the design and access requirements for the TP platform.
- Review the TP platform layout designs in context to O&M operations as well as the different access methods interaction.
- Evaluate the different areas within the TP platform and how these could be standardised to better optimise O&M strategy efficiency.
- Produce a general arrangement (GA) drawing of a proposed TP platform based upon the findings from the standardisation review
- Create a road map detailing the next steps for the potential future implementation of standardised TP platform infrastructure.
The expected benefits of this work are that it will allow for a better understanding of the specific requirements and standardisation potential for TP platform design in context to O&M operations.
The deadline for clarification questions is 3 May 2024 at 12:00 BST. The closing date to receive tender submissions is 24 May 12:00 BST.
All clarification questions and tender submissions should be sent electronically, by their respective deadlines to alistair.morris@carbontrust.com with arturo.andersen@carbontrust.com in copy.
Please note: The deadline for clarification questions has now passed. Answers to questions received can be downloaded below.