Floating Wind Joint Industry Programme: Power Curve Validation for Floating Turbines (PCV)

Calling for entries from companies and consortia interested in undertaking a study to identify and understand which parameters are important for power curve validation of floating turbines, to draw conclusions on the likely uncertainties associated with commercial technologies. 

The Floating Wind JIP would like to:

  • For floating turbines, determine the key parameters which need to be considered for power curve validation through engagement with key stakeholders;
  • Determine the uncertainty on each bin of the power curve when using different methods of wind resource assessment. 

The deadline for clarification questions is 7th March 2023 17:00 GMT.

The closing date to receive tender submissions is 31st March 2023 17:00 GMT.

All clarification questions and tender submissions should be sent electronically, by their respective deadlines to Mary.Harvey@carbontrust.com, with floatingwind@carbontrust.com in copy.