Floating Wind Joint Industry Programme: Guidance for Dynamic Cables (GDC)

Calling for entries from companies and consortia interested in undertaking a study to examine the existing guidelines, prediction methodologies and cross industry standards for dynamic cable fatigue and develop a guideline document that can be used by the wider offshore wind industry.

The Floating Wind JIP would like to:

  • Understand and review the existing guidelines within the offshore wind and analogous industries in context to dynamic cables. 
  • Engage with the relevant stakeholders across offshore wind and analogous industries to better understand the requirements. 
  • Develop an industry guideline document which can be used by suppliers, developers and operators in context to dynamic cable fatigue assessment and lifetime prediction to support warranty and insurability.

The deadline for clarification questions has now passed. Responses to questions received can be downloaded below.

The closing date to receive tender submissions is the 21 April 2023 15:00 BST.

All clarification questions and tender submissions should be sent electronically, by their respective deadlines to daniel.yates@carbontrust.com, with floatingwind@carbontrust.com in copy.