Invitation to Transition Piece Optimisation project for the Carbon Trust’s OWA Programme

Call for tenders to investigate transition piece optimisation. All offshore wind farms will approach the electrical design off the transition piece with different drivers although they are likely to perform similar assessments. There are numerous options available for cable installation, switchgear arrangement/location and LV systems but the optimal arrangement is not always clear. 

This project aims to review the project designs of WTG transition piece electrical layout configurations to date, potential current options and future improvements. Undertaking a risk assessment and cost benefit analysis will enable an assessment of the numerous possible configurations.

For further details on Scope of Work, Terms and Conditions, and details of how to apply, please click on the relevant links below.


Clarification questions should be received by 6th December 2017 at 17:00 and the answers to these questions will be posted below by 8th December 2017 at 17:00. The closing date to receive tender submissions is 8th January 2017 at 13:30.

 

All clarification questions and tender submissions should be sent electronically, by their respective deadlines, to Olivia.i.Burke@CarbonTrust.com.